Details
Translated title of the contribution | Factory Relocations in the Context of Reorganization Projects - Methodical Planning and Evaluation |
---|---|
Original language | German |
Pages (from-to) | 204-208 |
Number of pages | 5 |
Journal | ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb |
Volume | 118 |
Issue number | 4 |
Publication status | Published - 18 Apr 2023 |
Externally published | Yes |
Abstract
The realization of a planned layout concept represents a complex subtask within factory planning. In particular, the temporal arrangement of the necessary relocation steps, taking into account existing restrictions, is usually carried out manually according to the current state of the art. Therefore, an easy-touse method for planning a factory move for reorganization projects was developed in a research project, which can be applied by companies in a practical context.
ASJC Scopus subject areas
- Engineering(all)
- Business, Management and Accounting(all)
- Strategy and Management
- Decision Sciences(all)
- Management Science and Operations Research
Cite this
- Standard
- Harvard
- Apa
- Vancouver
- BibTeX
- RIS
In: ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, Vol. 118, No. 4, 18.04.2023, p. 204-208.
Research output: Contribution to journal › Article › Research › peer review
}
TY - JOUR
T1 - Fabrikumzüge im Rahmen von Reorganisationsprojekten Methodische Planung und Bewertung
AU - Nitsche, Andreas
AU - Stonis, Malte
AU - Nyhuis, Peter
PY - 2023/4/18
Y1 - 2023/4/18
N2 - The realization of a planned layout concept represents a complex subtask within factory planning. In particular, the temporal arrangement of the necessary relocation steps, taking into account existing restrictions, is usually carried out manually according to the current state of the art. Therefore, an easy-touse method for planning a factory move for reorganization projects was developed in a research project, which can be applied by companies in a practical context.
AB - The realization of a planned layout concept represents a complex subtask within factory planning. In particular, the temporal arrangement of the necessary relocation steps, taking into account existing restrictions, is usually carried out manually according to the current state of the art. Therefore, an easy-touse method for planning a factory move for reorganization projects was developed in a research project, which can be applied by companies in a practical context.
KW - Fabrikplanung
KW - Operations Research
KW - Optimierung
KW - Projektplanung
KW - Umzugsplanung
UR - http://www.scopus.com/inward/record.url?scp=85153863460&partnerID=8YFLogxK
U2 - 10.1515/zwf-2023-1024
DO - 10.1515/zwf-2023-1024
M3 - Artikel
AN - SCOPUS:85153863460
VL - 118
SP - 204
EP - 208
JO - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
JF - ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb
SN - 0947-0085
IS - 4
ER -